Development Thema

1. Design

  1. Stability in Towing condition
  2. Hull Strength ( incl. Fatigue analysis and Light weight estimation )
  3. Strength Evaluation of the hull and mooring lines during Earthquakes
  4. Chain wear protection around GRIP
  5. Selection of the mooring equipment

2. Building Process

  1. Dedicated crane to install a nacelle on top of the tower
  2. Dock Yard for final assembly
Dock Yard for huge floating structures , Source: JFE Technical Report No.25 (2010.2)
Dock Yard for huge floating structures , Source: JFE Technical Report No.25 (2010.2)

3. Installation

  1. How to prevent the occurrence of sudden tension in mooring lines during the descent of the container
  2. How to fill-up the containers with rocks and/or sand on the seabed

4. Maintenance

  1. How to install a blade in wind and waves in deep sea
  2. How to recover rocks and/or sand from the container