Development Thema

1. Design

  1. Stability in Towing condition
  2. Hull Strength ( incl. Fatigue analysis and Light weight estimation )
  3. Strength Evaluation of the hull and mooring lines during Earthquakes
  4. Chain wear protection around GRIP
  5. Selection of the mooring equipment

2. Building Process


3. Installation

  1. How to prevent the occurrence of sudden tension in mooring lines during the descent of the container
  2. How to fill-up the containers with rocks and/or sand on the seabed

4. Maintenance

  1. How to install a blade in wind and waves in deep sea
  2. How to recover rocks and/or sand from the container